亚洲一区亚洲二区三区-91精品福利少妇午夜-国产成人免费综合激情-欧美日本国产一区二区三区

Location: Home >>Product >>Power Technology >>Cable fusion

Cable intermediate molded fusion joints

model number:DX-WPS100-MRJ

Online Inquiry+8618926454155


Product details

Demand Analysis

The main causes of power cable line failure: According to statistics, power cable line failure (70 ~ 80)% occurred in the cable accessories (joints and terminals), and the failure rate of the intermediate joints is higher. Including the joints and accessories body quality problems, installation defects, environmental (water, dust, etc.) impact, in the cold and hot weather extreme load operation, the joints localized heat, accessories to accelerate thermal aging and lead to insulation degradation, under certain conditions induced breakdown faults.


Working Principle

10KV-110KV cable mold injection joint technology (MRJ), is based on the principle of cross-linked polyethylene cable body structure, in the truncated


Cable site production, the use of cable raw materials, based on the structure of the continuation of the layer to restore the connection, the scene regeneration of a new cable. Molded-Reinforced Jointing (MRJ)


The technology melts and combines the cable body structure to form a shield body without stress cone and active interface with consistent essential characteristics. The main solution


Core technical problems.

(1) No microscopic air (gap) between the cable insulation and joint insulation, shielding layer, to restore the intrinsic insulation properties.


(2) MRJ and cable combined as equivalent electrical properties, and cable field strength distribution consistent, eliminating any renewable electrical stress


 structural factors.


(3) Identical and stable physical and chemical properties.


(4) Durable safety and reliability.



Third, the functional characteristics


1, conductor connection performance: conductor using exothermic welding technology, conductor isometric, low-resistance, high-strength, welding point never aging, withstand the fault current impact and long-term high-current operation, electrical connections


 Durable and reliable electrical connection. The ratio of tensile breaking force of the conductor welding place to the body is 91.2%, and the tensile strength of the conductor joint reaches more than 90% of the strength of its body.


2, electric field stress control: MRJ according to the original cable conductor shielding and outer shielding structure, specifications and the same material to restore the production of conductor shielding layer and insulation shielding layer, to realize the MRJ and the original cable to a continuous, equivalent matching cable electric field shielding body.


 Effectively match the cable electric field shielding body, so that the electric field distribution and electric field strength in the natural state, highlighting the MRJ electrical stability and operational reliability.


3、Insulation:Using the same XLPE as the cable insulation to recover, MRJ insulation and cable insulation without air gap interface fusion bonding, structurally forming a consistent whole with the cable without obvious joint characteristics.


 Insulation strength is consistent with the original cable, with higher electrical insulation and stable operation of the durability of performance.


4、Performance of mechanical strength: copper core fusion bonding, the repair of the cable can be bent, without worrying about the impact of cable dragging.


5, waterproof performance: field layered injection melt, inside and outside the semi-conductor, insulation body and the original cable seamless fusion bonding, no interface, good waterproof performance.


6, the construction environment: the ambient temperature and humidity requirements are not high (due to the mold core cavity has a high temperature control);.


7、Application scope: two cable connection length is insufficient, MRJ in the length of less than 20cm distance case, can increase the conductor using exothermic welding to renew the conductor, so as to achieve the production of a


 MRJ connector can complete the power supply, reducing the cost of cable investment.


8, the external dimensions: and cable diameter is approximately equal or equal to the diameter of the production, and can be made in the MRJ cable bends, overhead suspension of the special location, does not take up too much space for use.

*** Translated with www.DeepL.com/Translator (free version) ***


Contact us

Shenzhen Dinsee Smart Technology Co.,Ltd
Tel:0755-21612345?Mobile&Whatsapp:+8618926454155
Fax:0755-21612345Whatsapp:+8618926454155E-Mail:business@szdx.com
Address: Building 2,xiangyuer Industry Part,NO.8 Longsheng Road,Longgang District,Shenzhen 518126,China

The online monitoring, distributed fault location and cable online monitoring equipment for power transmission and distribution lines launched by SHENZHEN DINSEE SMART TECHNOLOGY CO.,LTD. has been widely used in Southern Power Grid and State Grid, and has achieved good results.

Record No.: Yue ICP Bei 2022070794-1 | Website Map XML Map

日产精品毛片av一区二区三区| 色精品欧美人妻内射后入 | 亚洲国产精品不卡毛片| 麻豆视传媒视频在线观看| 亚洲欧美日韩国产色另类| 四虎永久免费高清视频| 国产av剧情高潮射精| 国产又粗又长又大又猛又爽| 欧美日韩国产精品第五页| 婷婷激情五月开心五月| 亚洲色图激情另类熟女| 日本亚洲无线码久久精品一区二区| 日本一区二区视频网站在线观看| 亚洲精品视频一区二区三区| 中文字幕午夜五月一二| 加勒比在线观看日本一区| 亚洲一区二区三区精品春色| 亚洲国产精品成人藏精阁| 91精品国产一区免费观看| 水蜜桃视频在线观看一区二区三区 | 免费午夜激情视频网站| 精品亚洲一二三区视频| 精品97人妻永久在线| 欧美肥臀一区二区三区| 国产精品综合一区二区三区| 国产日本欧美精品三级| 国产喷白浆一区二区三区网站| 国产大尺度激情做爰片| 亚洲天堂成人av成人| 日韩精品国产精品高清| 日本二区三区在线观看| 精品少妇人妻av在线| 国产av在线高清观看| 日本精品在线免费观看| 欧美日韩一区二区在线看| 夫妻性生活片在线观看| 国产在线三级自拍视频| 毛片一区二区三区免费质| 国产日韩亚洲欧美在线观看| 偷拍精品一区二区三区| 亚洲国产精品伦理在线观看|